HIAB Loader Cranes to China Railway
转载 2007-07-05 00:00 HIAB Source:HIAB| China Railway Construction Corporation, the second biggest railway corporation in China, has signed a contract for 23 units of HIAB 288 loader cranes. Productivity and safety were the main reasons for China Railway to choose the Hiab loader cranes. China will rail about 20 lines of high speed railway for passenger use. The maximum speed will reach 350 km/h. This project is to set up the test line. The line will run from Wuhan to Guangzhou, in southern China. The line is called Wu-Guang passenger transport line. The Wu-Guang line has been separated into 23 sections, and construction will start around September 2007. The loader cranes will be placed in all 23 sections of the Wu-Guang line. Each section contains a combination of 9 different construction machines for various functions. The first of the 9 HIAB units is a HIAB 288 mounted on a road-railway vehicle. Workers will use the crane to lay the rail in the correct position and to make adjustments. The order for the HIAB 288 loader cranes without support legs and outriggers is valued at over EUR 800,000. The cranes will be delivered between May and October 2007. |
Prev News
Yanmar 2007 Joint Service Power Expo
Relevant Info
More- ROYPOW Signs Agreement for Second Overseas Manufacturing Base in Indonesia
- Hyundai pushes electric forklift availability
- Hyster deploys hydrogen reach stacker at Rotterdam Shortsea Terminals
- HELI reports 22% y-o-y sales jump
- Hangcha X2 Series Reach Truck | Direct Access, Greater Versatility
- Linde MH releases explosion-protected electric forklifts
- HELI Showcases Core Product Portfolio at Saudi Warehousing & Logistics Expo 2026
- New Hangcha X2 Series Reach Truck | Go Deeper. Store More.
- Stabau S7 forks move up to eight pallets in one lift
- Clark electric forklift fleet helps power greener door production at Teckentrup
